
IDEE·SZ 2026 (International Digital Energy Expo) | Shenzhen Convention and Exhibition Center (Futian) · Hall 1 · Booth 1E08B | September 15–17, 2026
"Hey, isn't that Golead Intelligent?"
On the opening day of the exhibition, a visitor walked up to Booth 1E08B and recognized us at a glance. Turning to his companion, he said: "This is the manufacturer that makes the best synchronizers."
He used to work in the electrical secondary-equipment industry and has since moved into the new-energy track; he came to this exhibition especially for it. His track has changed, but he still recognized us instantly.
From September 15 to 17, IDEE·SZ 2026 — the International Digital Energy Expo — was held at the Shenzhen Convention and Exhibition Center (Futian). For Booth 1E08B, we prepared three solutions dedicated to resolving the "three major pain points" of power system operation safety control.
The synchronizer that our peer recognized at the very beginning answers the question "when is the right moment to close." This capability of judging power transients is also an extension of one same underlying technology into different scenarios — embodied in the three solutions below.
I. Microgrid with Multiple Sources — Who Does the Dispatching?

Solar PV, wind power, energy storage, and diesel generation are all connected into one grid, yet each operates on its own, making grid-connected/off-grid transitions and black start difficult to coordinate in a unified manner. Our hybrid energy management solution adopts a hierarchical control architecture that brings PV AGC, energy storage dispatch, anti-backflow control, and peak shaving / valley filling into one single dispatch framework. It supports 300+ communication protocols and operates across a wide temperature range of −40 °C to +85 °C, balancing reliability and compatibility in complex scenarios.
II. Power Source Transfer — How Can It Be Made Seamless?
The voltage sag at the instant of transfer causes equipment to trip in minor cases, and in severe cases brings production lines to a halt and causes data loss. The GLS-400 disturbance-free intelligent transfer system, built around the GLSV fast circuit breaker, achieves rapid fault identification and seamless transfer, maximizing continuity of power supply.
III. Inrush Current and Overvoltage — Can They Be Permanently Cured?

Conventional passive protection treats only the symptoms, not the root cause. The SID-3 series transient-impact suppression solution uses "precise residual magnetism calculation + controllable magnetic bias + optimal closing strategy" to suppress the impact at its source. Working together with the SID-3610 transformer magnetization/demagnetization instrument, it forms a complete closed loop of "suppression → elimination → intelligent management and control."